PROJECT SUMMARY
November 2021, 28-34 Clarke Street
JG Vertical were engaged to complete specific repairs on the external façade. During our pre repair investigation, we recommended and completed a new façade inspection. It was important to prioritise some items to be repaired.
The inspection on the external façade was completed via Rope Access and broken down into x20 individual drops throughout the entire façade.
Report and 900 photographs were submitted categorized into each drop for their reference.