Skip to content
Commercial

Parramatta Square

Project Summary


February 2022, The replica Rose Hill Packet boat on display in the lobby at Parramatta Square


Project Summary
Project Summary
Project Summary
Project Summary
Project Summary
Project Summary
Project Summary
Project Summary
Project Summary
Project Summary
Project Summary
Project Summary

JG Vertical was engaged by Walker Group to support the delivery of major works within the Parramatta Square precinct, one of Australia’s largest urban renewal developments. Our team provided specialist rope access, rigging and lifting support across a complex live environment, contributing to the installation of large-scale architectural and structural elements within the civic and commercial spaces of the development. The project required precise coordination with multiple stakeholders to ensure safe delivery within a high-profile public precinct while maintaining strict safety and program requirements.

Scope of Work

Pre-inspection site meetings with the client and all stakeholders

Detailed planning and coordination of works across a live commercial environment

Development of safe rope access and lifting methodologies for installation works

Assessment of access strategies to minimise disruption to public and surrounding trades

Implementation of rope access systems, rigging solutions and engineered lifting plans

Coordination with builders and specialist contractors across multiple stages of works

JG Completed the Following

Installed and utilised rope access systems to support complex installation works within the precinct.

Coordinated lifting and positioning operations for large-scale architectural elements within the Parramatta Square development.

Implemented engineered rigging solutions to safely control lifting and placement activities.

Ensured all works were delivered safely within a live, high-traffic civic and commercial environment.

Completed all operations in line with strict safety and project program requirements.

Worked alongside multiple contractors and stakeholders to maintain sequencing across site operations.

Provided specialist rope access support to assist with high-level installation and structural positioning tasks.

See the Work